The Regional Transportation Plan (RTP) includes a set of fiscally constrained Regional Capital Projects (RCPs). Sometimes, new projects are proposed or existing RCPs undergo a significant change in funding or development status. This warrants a new evaluation and potential amendment to the RTP to address the change. Amendments undergo the same analysis and public discussion as projects identified in the plan development process. During the process, CMAP analyzes the proposal’s alignment with the RTP and air quality conformity. Project sponsors also provide their own assessment, supporting information, and analysis. When are amendments needed? A plan amendment is not required for every change to a project. RTP amendments are required only when a project sponsor is actively seeking federal funding or federal action — such as engineering, design, or construction permits — and the proposed improvements are not already in the fiscally constrained RTP. Sponsors may also seek amendments for existing RCPs if the project is facing changes in scope or costs that exceed thresholds set in the Administrative Policies and Procedures Appendix. Inclusion in the RTP fiscal constraint is not required to receive funding or approval for planning activities, such as an alternatives analysis. For this reason, projects that are in the early stages of planning and alternatives analysis may wait until the next four-year RTP update to submit the project for inclusion in the fiscally constrained RTP, or to submit updates to project cost and scope. Learn more about the amendment types and request process in the Administrative Policies and Procedures Appendix. Explore the RTP RTP Overview Go in Depth Explore the Projects Explore the Funding Landscape Planning for the Region’s Growth Amending the Plan Read the RTP Download the executive summaryOpen Download the executive summary in a new tab Download the full planOpen Download the full plan in a new tab Transportation News Newsletter sign-up Opens in a modal Related news Click to read $450 million available in FFY 2028-32 for roadway, transit, and bike and pedestrian projects in northeastern Illinois Posted on Click to read $450 million available in FFY 2028-32 for roadway, transit, and bike and pedestrian projects in northeastern Illinois 10.19.26 Click to read Nearly $885 million awarded for local transportation projects across northeastern Illinois Posted on Click to read Nearly $885 million awarded for local transportation projects across northeastern Illinois 10.15.26 Click to read The Century Plan Grand Challenges: Focusing where regional action matters most Posted on Click to read The Century Plan Grand Challenges: Focusing where regional action matters most 10.14.26 Click to read CMAP adopts long-range transportation plan to guide northeastern Illinois through 2050 Posted on Click to read CMAP adopts long-range transportation plan to guide northeastern Illinois through 2050 10.14.26